Skip to content

Our

solutions

“Y” Awarded-by-Concession System

A comprehensive oil pipeline system that stretches across 4 provinces
(Neuquén, Río Negro, La Pampa and Buenos Aires).

from end to end

Concession granted by the National Government

Enforcement Authority: Energy Department of the Argentine Republic.

Public Service. OPEN ACCESS System

A natural monopoly with a government-regulated rate, calculated on the basis of an investment plan and designated expenses vs estimated volume.

“Y” Awarded-by-Concession System

Our Facilities

Planning together
with our Clients

Based on a Transportation Planning System, which involves 100% our clients (the ones who feed the system), we develop 5-year production projections.

This process, which is conducted every six months, results in the processes required for the medium and long-term transportation system.

It allows us to understand the industry’s present and future needs and to fully commit with our clients to developing projects that ensure the continuity of operations.  

At present we are developing projects that have stemmed from this process.

C.E.T.A

Knowledge, Experience and Asset Technology

TO SERVICE OUR CLIENTS

CETA Assets

Loma Campana Oil Pipeline

Pellegrini Lake

Operation, maintenance and logistics administration
since April 2019

6.398.216 m3

Volume
transported

99,8%

Service
availability

ZERO

Spills, environmental incidents, or accidents.

Consulting services to reduce variable operating costs, reducing consumption of paraffin inhibitors.

Hydraulic capacity studies to detect future bottlenecks in the system.

Our Clients

The complexity of our system means we are specialists in measuring and commercially managing different types of liquid hydrocarbons.